360 Home Enhancers
Luxury home exterior
Project Proposal

Westlake Country
& Safari Estate

A complete interior renovation — designed to transform a residence into a sophisticated, modern home where luxury finishes meet practical living.

Prepared For
Joseph Tsiloane
Prepared By
360 Home Enhancers
Project Value
R 608,405
Duration
8 – 12 Weeks
01 · Overview

A residence, reimagined.

360 Home Enhancers is pleased to present this proposal for the renovation and modernization of the residence located at Westlake Country & Safari Estate.

The project has been carefully structured to ensure efficient workflow, quality workmanship, and minimal disruption while transforming the property into a modern, luxurious living space.

New bulkhead & suspended ceilings with feature lighting
Large-format tiling to all living areas
Premium laminate flooring to bedrooms
Downstairs bathroom — full renovation
Upstairs shared bathroom — full renovation
Main ensuite bathroom — full renovation
Interior painting throughout the residence
Premium kitchen with scullery & quartz tops
02 · Execution Plan

Eight phases.
One seamless transformation.

Phase 01
01
Phase 01

Site Establishment & Protection

Every great renovation begins with respect for what's already there. We begin by protecting existing finishes and fixtures, coordinating material deliveries, and establishing dedicated work zones.

  • Site handover
  • Protection of existing finishes & fixtures
  • Material deliveries
  • Establishment of work areas
Duration · 1 – 2 Days
Ceiling Installation & Lighting
Phase 02

Ceiling Installation & Lighting

Work commences overhead — installing new ceilings, bulkhead detailing, and integrated LED lighting throughout the home. Completing this first protects the flooring and wall finishes that follow.

  • New ceiling framework
  • Suspended ceiling installation
  • Bulkhead detailing
  • LED strip lighting
  • LED downlights
  • Electrical modifications & connections
  • Ceiling preparation & finishing
Duration · 1 – 2 Weeks
Flooring & House Tiling
Phase 03

Flooring & House Tiling

Large-format tiles are laid through the home's primary living spaces — surface preparation and leveling first, followed by precision installation, edge trims and grouting.

  • Surface preparation
  • Floor leveling where required
  • Large-format tile installation
  • Aluminium edge trims
  • Grouting & finishing
  • Entrance · Lounge · Dining
  • Passageways
  • Open-plan living spaces
Duration · 2 – 3 Weeks
Phase 04
04
Phase 04

Plumbing Alterations & Bathroom Prep

While tiling progresses, plumbing crews begin parallel work inside the bathrooms — ensuring the tiling teams can move directly into wet areas without delay.

Downstairs Bathroom
  • Plumbing modifications
  • Floating toilet preparation
  • Shower relocation & pipework
  • Vanity plumbing points
  • Drainage adjustments
Shared Upstairs Bathroom
  • Plumbing modifications
  • Bath installation preparation
  • Double vanity plumbing
  • Floating toilet preparation
  • Shower system preparation
Duration · Concurrent with tiling
Bathroom Renovations
Phase 05

Bathroom Renovations

Three bathrooms — three distinct interpretations of contemporary luxury. From obsidian-black detailing to warm-gold restraint, each room is treated as its own composition.

Duration · 3 – 4 Weeks
Black accents

Downstairs Bathroom

  • ·Floating toilet
  • ·Black flush plate
  • ·Frameless shower screen
  • ·Black shower fittings
  • ·Freestanding basin
  • ·Floating vanity
  • ·Black framed mirror
  • ·Modern black accessories
Gold & quartz

Shared Upstairs Bathroom

  • ·Freestanding quartz bathtub
  • ·Double vanity with quartz top
  • ·Floating toilet
  • ·Gold fittings & accessories
  • ·Gold framed mirrors
  • ·Frameless shower screen
  • ·Luxury hotel-inspired finish
Smart luxury

Main Bedroom Ensuite

  • ·Freestanding quartz bathtub
  • ·Double vanity
  • ·Smart floating toilet
  • ·LED illuminated mirror
  • ·Black luxury fittings
  • ·Frameless shower enclosure
  • ·Premium modern aesthetic
Bedroom Flooring
Phase 06

Bedroom Flooring

Premium laminate flooring is laid throughout the bedrooms — quiet, warm underfoot, and quietly luxurious in profile.

  • Underlay installation
  • Laminate flooring installation
  • Trims & transitions
  • Finishing & clean-up
Duration · 3 – 5 Days
Interior Painting
Phase 07

Interior Painting

Painting is intentionally scheduled toward the end of the project — ensuring walls remain pristine, untouched by the activity of construction.

  • Crack repairs
  • Surface preparation
  • Priming where required
  • Wall painting
  • Ceiling touch-ups
  • Final finishing
Duration · 1 – 2 Weeks
Final Inspection & Handover
Phase 08

Final Inspection & Handover

The project concludes with the same care it began. A thorough quality control inspection, snag list completion, a professional deep clean, and a walkthrough with you — the home, ready.

  • Quality control inspection
  • Snag list completion
  • Professional cleaning
  • Client walkthrough
  • Project handover
Duration · Final week
Timeline

8 – 12 Weeks
from establishment to handover

Actual duration may vary depending on material lead times, site conditions, weather, and client-approved variations.

Warranty

Built to last,
guaranteed in writing.

  • ·6-Month Workmanship Guarantee
  • ·Manufacturer warranties on applicable products and fittings
In Closing

A sophisticated, modern home — delivered with care.

Through considered project sequencing and experienced project management, 360 Home Enhancers will deliver a seamless renovation experience and an exceptional final result — a home that combines luxury finishes, practical functionality, and long-term durability.